Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the simple-custom-post-order domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/eqa-eonesolutions-1/wp-includes/functions.php on line 6121
Integration Projects Are Easy: 10 Steps to a Successful Project – eOne

Integration Projects Are Easy: 10 Steps to a Successful Project

We have 10 steps for an easy integration project. Those steps being 1. Have someone who knows the source data 2. Have someone who knows the destination rules 3. They MUST be able to talk to each other 4. Create a file with the mapping. Listing all data requirements. 5. Review all data mapping. 6. Determine what data needs to be transformed. 7. Pick the best way to transform the data. 8. Start with a small test. 9. Ensure everything works and security set before Go Live. 10. If keeping two systems in synch, pick one side to be the master. We'll review each step, and you'll see how every customer can benefit from virtual integration.