SmartPost

Weekly Schedules

A weekly schedule sets a Routine to run every x weeks, on selected days, at the selected time.

 

To schedule a Routine to run weekly:

1.Open the SmartPost Routine setup window by going to Microsoft Dynamics GP - Tools - Setup - SmartPost - Posting Routine.
2.Select 'Weekly' as the schedule task option.

Weekly

 

3.Enter the time that the Routine run should start.
4.Enter the number of weeks between each run of the Routine.
5.Select the day(s) of the week where the Routine is to be run.
6.If the Routine is required to be run multiple times each day it is run, mark the Repeat every... checkbox and enter the minutes between the start time and the time before which the last daily run should start.
7.Click save to save the Routine amendments.